.
One-Stop Shop:

 

There will be a one-stop shop, which enables the investors to handle building permits, registrations and all the governmental works in only one location.
Health Center:
  A medical clinic will be established where health protection and first aid services will be performed.
Vocational Training Center:
  A training center will be established where workers will be trained by Turkish experts to familiarize them with the technology in the factories and increase their productivity.
Logistics Center:
 
An "intelligent" logistics center will be established to help the investors to reserve less space for warehouse in their parcels and focus more on manufacturing, which will reduce cost and increase efficiency.
Day Care Center:
  The day care center will accommodate 350 children
Security Center:
  Security of the premises and employees' safety is a top priority issue.
The evaluation and maintenance of security features; procedures for emergencies such as fire, power failure as well as on-site traffic control will be coordinated from the Security Center.
Utility Management and General Maintenance and Repairs:
  Maintaining the value of the Park will require constant evaluation of its grounds keeping; maintenance and repair of the roads, parking lots, signage and lighting; cleaning; management and maintenance of building systems (electrical, plumbing, communications); and general repairs and maintenance.
Conference Halls:
  A total of 1,000 sqm area will be reserved as conference halls.
Building Services:
  As investors are contractually responsible for the operation and maintenance of their premises, various building services such as mechanical help, daily cleaning, or constructional issues will be available at competitive rates
Restaurant and Coffee Shops:
  An area of 2.300 sq m will be provided to the investors in the ground floor including a kitchen, cafeteria, restaurant and a coffee shop.
Gas Station:
  A gas station will be settled in the park near the truck garage.
Police Station, Fire Station and Post Office:
  The necessary space will be provided for these public services in the administrative and service building
Important Notes
 

- The plots are for industrial usage.
- Footprint in the plot : max %65, min % 40 of total plot area;%25 is accepted to start operation.
- Construction has to start within 9 months; two years are allowed for minimun %25 construction and applying for operation license.
- Transfer of the title is bound with operation license, minimum %40 build up area and total payment of the land value.
- Maximum height is 15m.

 

HOME PAGE | FOUNDERS | NEWS | PROJECT IN  FIGURES | MASTER PLAN | INFRASTRUCTURE

PRESS | FACILITIES | APPLICATION FORM | EGYPT ECONOMY | PHOTO GALLERY

 | EGYPT MAP | 6th OCTOBER MAP | PIIP ON GOOGLE | CONTACT US

 

Polaris Parks Copyright © 2008